2007

For Winrock Amore – Supply and installation of Solar Power Systems (SHS, BCS and Streetlights) for 46 barangays in Maguindanao, Tawi-Tawi and Zamboanga del Sur.

For Bangko Sentral ng Pilipinas – Supply, delivery, installation, testing and commissioning of three (3) units x 630 kVA Distribution Transformers.

For Siemens Power Operations, Inc. – Supply and delivery of entire overhauling spare parts for the preventive maintenance of condensate extraction pumps, waste water pumps, auxiliary pumps, seawater intake pumps intended for both 1,000 MW Sta Rita Combined Cycle Power Plant.

For National Power Corporation (NPC) Alliance (formerly Bataan Polyethylene Plant) – Supply of labor and materials for the rehabilitation of two (2) units x 450 kW Burckhardt Compression AG Vent Recovery compressor for the production of polyethylene.

For Lafarge – Supply & delivery of MAAG Gear Boxes and spare parts for RCC Bulacan.

For Coral Bay Nickel Corporation – Conducted semi-annual preventive maintenance of 2 units Bauer High Pressure compressor.

For Semirara Mining Corporation – Supply and delivery of Motor Rotor for the rehabilitation of 7 MW Elin EBG Generator.

For JG Summit Petrochemicals Corporation – Supply and delivery of spare parts for the rehabilitation of Labyrinth Type Gas Compressor form Burckhardt Compression AG.

For Semirara Mining Corporation – Supply and delivery of spare parts for the rehabilitation of 15 MW Elin EBG Generator.

For Philip Morris Philippine, Inc. – Conducted corrective maintenance of High-Pressure Diet Impregnation System using Bauer High-Pressure Compressor.

For Semirara Mining Corporation – Supply and delivery of twenty (20) Units Type 562 TVVYG Voith Constant Turbo Couplings for the 1,500 km coal conveyor system.

For Coral Bay Nickel Corporation – Conducted semi-annual preventive maintenance of 2 x 10 HP Bauer High Pressure Compressor.

For Philip Morris Philippines, Inc. – Conducted preventive maintenance of High-Pressure Diet Impregnation System using Bauer High Pressure Compressor for 4,000 running hours.

For Petron Bataan Oil Refinery – Turnkey supply of labor, manpower and equipment for the upgrade of 2 x API 618 (780 kW) Centrifugal Air Compressor Motor Starter in Limay, Bataan.

For Petron – Installation, testing and commissioning of 2 x 720 kW brand new Cameron Centrifugal Compressor including 2 High pressure vessels.

For Department of Energy (DOE) – Supply and installation of Solar Power Systems (SHS, BCS and Streetlights) for 40 barangays in Agusan del Sur, Davao del Sur, Misamis and Zamboanga del Sur.

For Guard-All Security Systems, Inc. – Supply and installation of solar power supply of wireless CCTV traffic monitory at the North Luzon Expressway.

For Biliran Geothermal Inc. – Supplied Perkins generator sets 25 kVA and 38 kVA.